Southwest Airlines flight WN 4353: Multiple routes

Ad box here 1220564027 I FlightWNum Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sun 07:30 Phoenix Sky Harbor (PHX) 4 09:00 Burbank (BUR)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Operates only on 2026-05-24
Sun 07:35 Phoenix Sky Harbor (PHX) 4 09:05 Burbank (BUR)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-04-12 through 2026-05-17
Sun 07:35 Phoenix Sky Harbor (PHX) 4 09:05 Burbank (BUR)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Operates only on 2026-05-31
Mon,Thu,Fri 08:05 Nashville (BNA) 09:30 Destin/Fort Walton Beach (VPS)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-06-04 through 2026-08-03
Tue,Wed 08:15 Nashville (BNA) 09:40 Destin/Fort Walton Beach (VPS)
WN 4353 Non-stop Boeing 737-800 (73H) 1:25 Effective 2026-06-09 through 2026-07-29
Tue,Wed 08:40 Phoenix Sky Harbor (PHX) 4 10:15 Burbank (BUR)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-04-07 through 2026-06-03
Sun 08:45 Nashville (BNA) 10:10 Destin/Fort Walton Beach (VPS)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-06-07 through 2026-08-02
Mon,Thu,Fri 10:05 Destin/Fort Walton Beach (VPS) 12:05 Dallas Love Field (DAL) 1
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 2:00 Effective 2026-06-04 through 2026-08-03
Tue,Wed 10:30 Destin/Fort Walton Beach (VPS) 12:30 Dallas Love Field (DAL) 1
WN 4353 Non-stop Boeing 737-800 (73H) 2:00 Effective 2026-06-09 through 2026-07-29
Mon,Thu,Fri 14:55 San Diego (SAN) 1 18:15 Denver (DEN)
WN 4353 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2026-03-05 through 2026-04-06
Sat 14:55 San Diego (SAN) 1 18:15 Denver (DEN)
WN 4353 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-03-07 through 2026-04-04
Tue,Wed 14:55 San Diego (SAN) 1 18:15 Denver (DEN)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 2:20 Effective 2026-03-10 through 2026-04-01
Tue,Wed,Sat 15:00 Phoenix Sky Harbor (PHX) 4 16:10 Las Vegas Harry Reid (LAS) 1
WN 4353 Non-stop Boeing 737-800 (73H) 1:10 Effective 2026-08-04 through 2026-09-30
Sat 15:25 Detroit (DTW) E 17:45 Phoenix Sky Harbor (PHX) 4
WN 4353 Non-stop Boeing 737-800 (73H) 4:20 Valid until 2026-01-03
Mon,Thu,Fri 16:55 Phoenix Sky Harbor (PHX) 4 18:05 Las Vegas Harry Reid (LAS) 1
WN 4353 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2026-08-06 through 2026-09-28
Sun 16:55 Phoenix Sky Harbor (PHX) 4 18:05 Las Vegas Harry Reid (LAS) 1
WN 4353 Non-stop Boeing 737-800 (73H) 1:10 Effective 2026-08-09 through 2026-09-27
Wed,Thu 19:50 Sacramento (SMF) B 22:15 Boise (BOI)
WN 4353 Non-stop Boeing 737-700 (73W) 1:25 Valid until 2026-01-01
Mon 21:25 Sacramento (SMF) B 23:50 Boise (BOI)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-01-05
Fri,Sun 21:40 Sacramento (SMF) B 00:05 Boise (BOI)
WN 4353 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-01-02 through 2026-01-04
The flight arrives 1 day after departure.
Non-Direct Flights:
Mon,Thu,Fri 08:05 Nashville (BNA) 12:05 Dallas Love Field (DAL) 1
WN 4353 1-stop Boeing 737-700 (Scimitar Winglets) 4:00 Effective 2026-06-04 through 2026-08-03
Tue,Wed 08:15 Nashville (BNA) 12:30 Dallas Love Field (DAL) 1
WN 4353 1-stop Boeing 737-800 (73H) 4:15 Effective 2026-06-09 through 2026-07-29
Ad flat here 1377413384 I FlightWNum Lower
Parallax here
This flight number is listed as serving the following routes:
Southwest Airlines flight WN 4353: Multiple routes
Ad mobi flat here (320x100px) 6074960173 M FlightWNum Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Southwest Airlines WN4353
Operates only on 2026-05-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-04-12 through 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Operates only on 2026-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-06-04 through 2026-08-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-06-09 through 2026-07-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-04-07 through 2026-06-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-06-07 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-06-04 through 2026-08-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-06-09 through 2026-07-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-03-05 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-03-07 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-03-10 through 2026-04-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-08-04 through 2026-09-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Direct Flights:

Southwest Airlines WN4353
Valid until 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-08-06 through 2026-09-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Southwest Airlines WN4353
Effective 2026-08-09 through 2026-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Direct Flights:

Southwest Airlines WN4353
Valid until 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Direct Flights:

Southwest Airlines WN4353
Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Southwest Airlines WN4353
21:40

00:05(+1)
Effective 2026-01-02 through 2026-01-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)
The flight arrives 1 day after departure.

Non-Direct Flights:

Southwest Airlines WN4353
Effective 2026-06-04 through 2026-08-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:00, 1-stop
Boeing 737-700 (Scimitar Winglets)

Non-Direct Flights:

Southwest Airlines WN4353
Effective 2026-06-09 through 2026-07-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:15, 1-stop
Boeing 737-800 (73H)
Ad mobi box here (300x250px) 8888825773 M FlightWNum Bottom Box
Parallax here
This flight number is listed as serving the following routes:
  • Destin/Fort Walton Beach (VPS) - Dallas Love Field (DAL)
  • Detroit (DTW) - Phoenix Sky Harbor (PHX)
  • Nashville (BNA) - Dallas Love Field (DAL)
  • Nashville (BNA) - Destin/Fort Walton Beach (VPS)
  • Phoenix Sky Harbor (PHX) - Burbank (BUR)
  • Phoenix Sky Harbor (PHX) - Las Vegas Harry Reid (LAS)
  • Sacramento (SMF) - Boise (BOI)
  • San Diego (SAN) - Denver (DEN)